How To Install Slatwall

How To Install SlatwallSlatwall Installation Instructions

The following information is a guide for installing slatwall which we hope you will find helpful. Slatwall is a wood based product and is susceptible to expansion and contraction when exposed to different temperatures and moisture levels. Panels should be stored flat, in dry conditions, at 20 °C, and should be allowed to 'condition' to the environment where they are to be installed for at least 48 hours prior to installation. As each slatwall board measures 8ftx4ft and weighs around 35Kg, when transporting, every care should be taken not to scuff the edges or scratch the surface. Walls should be completely dry and if necessary a vapour barrier should first be applied to prevent any moisture affecting the panels.

To start the second panel, align the tongue on the top of the second panel with the groove on the bottom of the first row. Download Gerontological Nursing Competencies For Care 2nd Edition Test Bank. Drill a screw into every slot along the stud line. Continue process until all slatwall pieces are installed.

Slatwall can be fixed direct to solid internal walls which are true, but for best results should be fixed to 25mm x 75mm timber battens or a specialist battening system. Hioki 3261 User Manual. Accurate fixing of grounds will ensure easy alignment of butting panels. Sharp Ar-5320e Driver Download For Windows 7. Fixing Fix vertical battens at a maximum of 600mm centres and level through (Fig 1.).